EXPERIENCE

WTP 400 lps Durolis- Riau

Relocation and Rehabilitation of package water treatment plant at Citra Raya Residence – Tangerang, 1st Stage
Relokasi dan Rehabilitasi Paket Instalasi Pengolahan Air di Perumahan Citra Raya – Tangerang, Tahap I

123

Scope of Work

  • Civil works
  • Raw water intake relocation
  • Clarifier relocation
  • Filter relocation
  • Chemical system arrangement
  • Hydrophore tank relocation
  • Setting filter pumps, distribution pumps and panel installation
  • Raw water piping system arrangement
  • Supply of raw water pumps, electrical panel and accessories

Lingkup Pekerjaan

  • Pekerjaan sipil
  • Relokasi bangunan sadap air baku
  • Relokasi bangunan pengendapan
  • Relokasi bangunan filter
  • Pengaturan sistem bahan kimia
  • Relokasi tangki hydrophore
  • Pengaturan pompa filter, pompa distribusi dan pemasangan panel
  • Pengaturan sistem perpipaan air baku
  • Pengadaan pompa air baku, panel elektrik, dan asesorisnya

 

Rehabilitation of package water treatment plant at Citra Raya Residence – Tangerang, 2nd Stage
Rehabilitasi Paket Instalasi Pengolahan Air di Perumahan Citra Raya – Tangerang, Tahap II

312

Scope of Work

  • Clarifier and filter rehabilitation
  • Repainting
  • Supply and installation of chemical dozing pumps, electrical panel and filter nozzle

Lingkup Pekerjaan

  • Rehabilitasi bangunan pengendapan
  • Pengecatan ulang
  • Pengadaan dan pemasangan pompa pembubuhan bahan kimia, panel elektrik, dan nozzle filter

 

Study for Rehabilitation of Water Treatment Plant Capacity 416 lps at PDAM Bandarmasih – Banjarmasin
Rehabilitasi Instalasi Pengolahan Air Kapasitas 416 l/det di PDAM Bandarmasih – Banjarmasin

132

Scope of Work

  • Investigation on electrical panel conditions
  • Investigation on raw water intake pumps and distribution pumps
  • Problem identifications on mixing chamber, pulsators, filters and other mechanical equipment
  • Propose for refurbishment program to increase plant performance entirely
  • Recommendation on water treatment plant’s efficiency program and performance upgrading

Lingkup Pekerjaan

  • Pemeriksaan kondisi panel elektrik
  • Pemeriksaan pompa air baku dan pompa distribusi
  • Identifikasi permasalahan pada bangunan pencampuran bahan kimia, pulsator, filter dan peralatan mekanik
  • Usulan untuk melengkapi program untuk meningkatkan kinerja IPA secara menyeluruh
  • Rekomendasi program efisiensi IPA dan peningkatan kinterja IPA

 

Detail Engineering Design of Raw Water Intake II of Kaligarang WTP PDAM Kota Semarang
Rancangan Rinci Teknis Bangunan Sadap Air Baku II IPA Kaligarang PDAM Kota Semarang

321

Scope of Work

  • Planning and designing new raw water intake with capacity 1.000 lps to be used for existing water treatment plant
  • Perform hydrological analysis for water demand and flood drainage run off
  • Perform geological and topography survey and analysis
  • Develop all facility plan
  • Planning and design of pumping station (including mechanical and electrical facilities)
  • Planning and design of civil works and water channel
  • Prepare detail design drawings, bill of quantity, and tender document.

Lingkup Pekerjaan

  • Perencanaan dan rancangan bangunan sadap air baku baru dengan kapasitas 1.000 l/det untuk digunakan IPA yang telah ada
  • Membuat analisis hidrologi untuk kebutuhan air dan drainase air
  • Melakukan survey dan analisis geologi dan topographi
  • Membangun semua rencana fasilitas
  • Merencanakan dan merancang stasiun pompa (termasuk fasilitas mekanik dan elektriknya)
  • Merencanakan dan merancang pekerjaan sipil dan saluran air
  • Menyiapkan gambar rancangan rinci, daftar kuantitas, dan dokumen tender

 

Pressure Sand Filter Modification, Total Capacity 880 Lps PT. Jababeka Infrastruktur – Cikarang
Modifikasi Pressure Sand Filter, Total Kapasitas 880 l/dt PT. Jababeka Infrastruktur – Cikarang

123

Scope of Work

  • Detail Engineering Design arrangement to modify pressure sand filter become gravity sand filter.
  • Supply, fabrication and installation of header pipe DN 600 and DN 500.
  • Supply, fabrication and installation of filter tanks Dia. 2900.
  • Modification of existing filter tanks and piping.
  • Supply and installation of filter media and nozzle.
  • Test and commissioning
  • As built drawing

Lingkup Pekerjaan

  • Menyusun Detail Engineering Design untuk modifikasi pressure sand filter menjadi gravity sand filter.
  • Supply, fabrikasi dan instalasi pipa header DN 600 dan DN 500
  • Supply, fabrikasi, dan instalasi tanki filter Dia.2900.
  • Modifikasi filter eksisting.
  • Supply dan instalasi filter media dan nozzle
  • Uji coba operasi
  • Gambar terpasang

 

Filter and Chemical System Rehabilitation of Gajah Mungkur WTP Capacity 500 lps, Semarang
Rehabilitasi Filter dan Sistem Bahan Kimia IPA Gajah Mungkur Kapasitas 500 L/det, Semarang

123

Scope of Work

  • Supply, fabrication and installation of filter pipe DN 200 – DN 500 and pneumatic valves
  • Supply, fabrication and installation of chemical pipe and tanks.
  • Test and commissioning
  • As built drawing

Lingkup Pekerjaan

  • Supply, fabrikasi dan instalasi pipa filter DN 200-DN 500
  • Supply, fabrikasi, dan instalasi pipa bahan kimia dan tanki-tanki kimia.
  • Uji coba operasi
  • Gambar terpasang

 

Supply, Installation & Relocation of Raw Water Pump PDAM Bandarmasih, Banjarmasin
Pengadaan , Pemasangan dan Pemindahan Pompa Air Baku PDAM Bandarmasih, Banjarmasin

12

Scope of Work

  • Supply & Installatio of raw water pump type centrifugal capacity 500 m3/hour
  • Dismantling existing pump capacity 1000 m3/hour
  • Supply, fabrication and installation of header pipe and accessories.
  • Test and commissioning
  • As built drawing

Lingkup Pekerjaan

  • Pengadaan dan pemasangan pompa air baku type centrifugal, kapasitas 500 m3/jam
  • Pemindahan pompa existing kapasitas 1000 m3/jam
  • Supply, fabrikasi, dan instalasi pipa header dan Accessories.
  • Uji coba operasi
  • Gambar terpasang

 

Pulsator Rehabilitation of A. Yani WTP PDAM Bandarmasih, Banjarmasin
Rehabilitasi Pulsator IPA A. Yani PDAM Bandarmasih, Banjarmasin

123

Scope of Work

  • Supply & Installation of stealing Plate
  • Vacuum chamber rehabilitation
  • Supply and installation control panel, pneumatic valve and piping.
  • Test and commissioning
  • As built drawing

Lingkup Pekerjaan

  • Pengadaan dan pemasangan stealing plate
  • Rehabilitasi vacuum chamber
  • Supply dan instalasi panel control, pneumatic valve dan perpipaan.
  • Uji coba operasi
  • Gambar terpasang

 

Rehabilitation Clarifier Line 2 of WTP Perumahan PT. Jababeka Infrastruktur, Cikarang
Rehabilitasi Clarifier Line 2 di WTP Perumahan PT. Jababeka Infrastruktur, Cikarang

 

312

Scope of Work

  • Supply & Installation of FRP tube settler
  • Supply and installation Raw water HDPE
  • Pipe
  • Test and commissioning
  • As built drawing

Lingkup Pekerjaan

  • Pengadaan dan pemasangan FRP tube settler
  • Pengadaan dan pemasangan Pipa HDPE untuk air baku
  • Uji coba operasi
  • Gambar terpasang

 

Pipe Transmission Works of Jababeka Industrial Estate PT. Jababeka Infrastruktur, Cikarang
Pekerjaan Pipa Transmisi Kawasan Industri Jababeka III PT. Jababeka Industri, Cikarang

133

Scope of Work

  • Supply and installation of HDPE pipe DN 250 and DN 500
  • Horizontal Boring Pipe DN 250 and DN 500 , length : 10 – 40 m
  • Test and commissioning
  • As built drawing

Lingkup Pekerjaan

  • Supply dan instalasi pipa HDPE DN 250 dan DN 500
  • Boring horisontal untuk pipa crossing, panjang : 10 – 40 m
  • Uji coba operasi
  • Gambar terpasang

 

Rehabilitation of A Yani WTP Capcity 416 Lps PDAM Bandarmasih, Banjarmasin
Rehabilitasi IPA A. Yani Kapasitas 416 l/det PDAM Bandarmasih, Banjarmasin

123

Scope of Work

  • Modification of Mixing Chamber
  • Pulsator Rehabilitation
  • Rehabilitation and modification of Sand Filter
  • Replacement of main Electrical Panel
  • Automation of Backwash Filter System with PLC
  • Improvement of Online Monitoring System

Lingkup Pekerjaan

  • Modifikasi Bak Pencampuran
  • Rehabilitasi Pulsator
  • Rehabilitasi dan modifikasi filter
  • Penggantian Elektrikal Panel
  • Automatisasi Backwash Filter dengan PLC
  • Penambahan Sistem Monitoring Online

 

Rehabilitation of Sand Filter Pejompongan 2 WTP, PT. PALYJA, Jakarta
Rehabilitasi Filter Pasir IPA Pejompongan 2, PT. PALYJA, Jakarta

132

Scope of Work

  • Demolish existing Bed Filter, including filter media and Anchor bolt.
  • Replacement Filter Bed, including Anchor Bolt SS 304, Bar Plate SS 304, Air pipe, Grouting and Nozzle Print.
  • Replacement Filter Media
  • Test and commissioning

Lingkup Pekerjaan

  • Pembongkaran Filter Bed Eksisting, termasuk filter media dan baut angkur
  • Penggantian Bed Filter, termasuk Baut Angkur SS 304, Plate strip SS 304, Pipa Udara, Grouting dan Penggantian Nozzle
  • Penggantian Media Filter
  • Test dan Commissioning

 

Design and Build Clear Water Production at The Plaza Balikpapan
Perencanaan dan Pembangunan Produksi Air Bersih di The Plaza Balikpapan

321

Scope of Work

  • Supply and Installation WTP Package Cap. 250 m3/day
  • Supply and Installation RO System Cap. 250 m3/day
  • Supply and Installation Iron Removal Filter
  • Test and commissioning
  • Operator Training

Lingkup Pekerjaan

  • Pembangunan IPA Kapasitas 250 m3/hari
  • System RO Kapasitas 250 m3/hari
  • Pembangunan STP Kapasitas 250
  • Pengadaan Iron Reomal
  • Test dan Commissioning
  • Pelatihan Operator

 

Water Supply Project Program West Aceh , New WTP Capicity 2 x 15 Lps – Beuregang, Meulaboh
Proyek Penyediaan Air Bersih Untuk Aceh Barat, IPA Baru Kapasitas 2×15 L/Det – Beuregang, Meulaboh

132

Scope of Work

  • Civil works
  • Raw water intake
  • Clarifier
  • Filter
  • Reservoir 250 m3
  • Chemical system arrangement
  • Setting filter pumps, distributionpumps and panel installation
  • Raw water piping system arrangement
  • Supply of raw water pumps, electrical panel and accessories

Lingkup Pekerjaan

  • Pekerjaan sipil
  • Pekerjaan bangunan sadap air baku
  • Pekerjaan bangunan pengendapan
  • Pekerjaan bangunan filter
  • Pekerjaan bangunan 250 m3
  • Pengaturan sistem bahan kimia
  • Pengaturan pompa filter, pompa distribusi dan pemasangan panel
  • Pengaturan sistem perpipaan air baku
  • Pengadaan pompa air baku, panel elektrik, dan asesorisnya

 

Rehabilitation & Uprating WTP II Ex. Italy 500 l/s to 1000 l/s and Resrvoir Capacity 10.000 m3 PDAM Bandarmasih, Banjarmasin Kalsel
Rehabilitasi dan Peningkatan kapasitas IPA II Eks. Italy dari 500 l/dt menjadi 1000 l/dt dan Pembangunan Reservoir Kapasitas 10.000 m3 PDAM Bandarmasih, Banjarmasin Kalsel

123

Scope of Work

  • Engineering
  • Procurement
  • Construction
  • Rehabilitation
  • Test commissioning

Lingkup Pekerjaan

  • Enginering
  • Pengadaan
  • Pelaksanaan konstruksi
  • Tes komisioning/ Uji coba

 

Engineering, Procurement and Construction waste water Treatment Plant PERTAMINA RU-IV Cilacap, Capacity 4000 m3/day
Pembangunan 1(Satu) Unit Instalasi Pengolahan Air Limbah (IPAL) PT. PERTAMINA RU-IV Cilacap, Kapasitas 4000 m3/hari

123

Scope of Work

  • Engineering
  • Mechanikal
    • CPI
    • Surface Aerator
    • Scrapper for sedimentation
    • Thickener
    • Pumps
    • DAF
    • Belt Press
    • Piping
  • Install & Construction
  • Test Commisioning

Lingkup Pekerjaan

  • Engineering
  • Mekanikal untuk:
    • CPI
    • Aerator
    • Scrapper untuk bak sedimentasi
    • Thickener
    • Pompa- pompa
    • DAF
    • Belt Press
  • Instalasi dan Konstruksi
  • Test dan komisioning

 

Drinking Water Treatment Plant Capacity 20 l/dt Air Port Sultan Mahmud Badaruddin II Palembang
Pembangunan WTP Paket Kap 20l/dt, Bandara Sultan Mahmud Badaruddin II Palembang

123

Scope of Work

  • Design / Engineering
  • Procurement
  • Construction
  • Test Commissioning

Lingkup Pekerjaan

  • Disain/ Engineering
  • Pengadaan
  • Konstruksi
  • Tes komisioning

 

Kemang Village Water Treatment Plant Project, Capacity 20 lps and Waste Water Treatment capacity 2000 m3/Day
Pekerjaan Instalasi Pengolahan Air Bersih Kemang Village, Kapasitas 20 liter/detik dan Pengolahan air limbah kapasitas 2000 m3/Hari

2-copy1-copy3-copy

Scope of Work

  • Engineering
  • Procurement
  • Construction
  • Test Commisioning
  • Supply & Install Submersible aerator
  • Supply & Install Automatic Microstrainer
  • WTP Package material Steel 20 lps
  • PLC & Scada
  • Piping & Raw Water pump

Lingkup Pekerjaan

  • Engineering
  • Pengadaan
  • Konstruksi
  • Test komisioning
  • Pengadaan dan pemasangan Submersible aerator
  • Pengadaan dan pemasangan automatic Microstrainer
  • WTP paket material Baja kapasitas 20 l/dt
  • PLC dan Scada
  • Perpipaan dan pompa air baku

 

St Moritz Town House & Apartment Water Treatment Plant Capacity 12,5 lps and Sewage Treatment Plant Project, Capacity 1500 m3/day
Pekerjaan Instalasi Pengolahan Air Bersih, Kapasitas 12,5 liter/detik dan Pengolahan Air Limbah St Moritz Town House & Apartment, Kapasitas 1500 m3/hari

321

Scope of Work

  • Engineering
  • Procurement
  • Construction
  • Test Commisioning
  • Supply & Install Submersible aerator
  • Supply & Install Automatic Microstrainer
  • WTP Package material Steel 12,5 lps
  • PLC & Scada
  • Piping & Raw Water pump

Lingkup Pekerjaan

  • Engineering
  • Pengadaan
  • Konstruksi
  • Test komisioning
  • Pengadaan dan pemasangan Submersible aerator
  • Pengadaan dan pemasangan automatic Microstrainer
  • WTP paket material Baja kapasitas 12,5 l/dt
  • PLC dan Scada
  • Perpipaan dan pompa air baku

 

Up Rating WTP Gunung Sari 3000 m3/jam PT. Petro Kimia Gresik
Up Rating IPA Gunung Sari 3000 m3/jam PT. Petro Kimia Gresik

1423

Scope of Work

  • Engineering
  • Procurement
  • Test Commisioning
  • Supply & Installation Mechanical
  • Installation Piping

Lingkup Pekerjaan

  • Engineering
  • Pengadaan
  • Test komisioning
  • Pengadaan dan pemasangan Mekanikal
  • Pemasangan Perpipaan

 

Design & Build Water Treatment Plant Capacity 500 lps PT. Moya Bekasi Jaya
Disain dan Konstruksi Instalasi Pengolahan Air Bersih Kapasitas 500 liter/detik PT. Moya Bekasi Jaya

231

Scope of Work

  • Engineering
  • Procurement
  • Construction
  • Test Commisioning
  • Install Pumping Station
  • Install Automatic Screen
  • WTP Sistem 500 lps incl. Civil works
  • PLC & Scada
  • Piping & Raw Water pump
  • Sludge Treatment
  • Chemical System
  • Chlorine system
  • Genset & Electrical Panel

Lingkup Pekerjaan

  • Engineering
  • Pengadaan
  • Konstruksi
  • Test komisioning
  • Pemasangan Pompa
  • Pemasangan automatic Screen
  • WTP paket 500 l/dt dan bangunan sipil
  • PLC dan Scada
  • Perpipaan dan pompa air baku
  • Pengolahan Lumpur
  • Sistem Kimia
  • Sistem Chlorin
  • Genset dan panel